Dc 24v rooftop parking air conditioner all in one design battery power
Product Video
Product Introduction
Colku model no. G31 Ac units use the Rotary Dc inverter compressor(GMCC),
Our strengths lies in:
1. Powerful cooling capacity (2200W/7480BTU), working temperature between 16~50℃,it shows a great performance in cooling even at high ambient temperature).
2. High energy efficiency : 3.1, Minimum current: 20A, the Ac units can be used about 3-6 hours in the daytime, 6-10 hours at night with 1 pair 180AH battery.
3. Colku unique Anti-shock structure for the Dc compressor system, which can effectively reduce the noise caused by compressor vibration, bring a quiet and comfortable rest environment.
Product Parameter
Type: Dc compressor (Rotor type)
Temperature setting: 15-30℃
Operating temperature range: 18~45℃
4 Modes: Only fan/Eco/Normal/Turbo
Color: multiple color (10+ Option)
Rated Input Voltage: DC 24V
Current consumption: 20-35A
Cooling capacity: 2200W/7480BTU
EER (COP): 3.15
Refrigerant: R410a/500g
Air flow: 450m3/h
Material: ABS (cover shell)
Indoor Unit Size: W350*D345*H140mm
Outdoor Unit Size: W976*D894*H215mm
Package size: W1040mm*D955mm*H455mm
Weight: 32kg/net, 38kg/gross
Product Features
Rated Input Voltage: DC 24V
Strong Cooling capacity: 2200W/7480BTU
COP 3.1, Power-efficient
Multiple color to choose
Special mounting kits for special truck
Quick and easy installation
High quality guarante
Product Application
It mainly widely used in 24V heavy duty truck for parking use, but aslo available when moving.
but it can also apply for camper,caravan, rv, motorhome, widely application.



FAQ
1. What are your prices? Our prices are subject to change depending on supply and other market factors.
We will send you an updated price list after your company contact us for further information.
2.Do you have a minimum order quantity? Yes, we require all international orders to have an ongoing minimum order quantity.
If you are looking to resell but in much smaller quantities, we recommend you check out our website
3.Can you supply the relevant documentation?
Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.
4.What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment.
The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products.
If our lead times do not work with your deadline, please go over your requirementswith your sale.
In all cases we will try to accommodate your needs. In most cases we are able to do so.
5.What kinds of payment methods do you accept?
You can make the payment to our bank account, Western Union or PayPal: 30% deposit in advance, 70% balance against the copy of B/L.